How much does it cost to build a house from aerated concrete, price. Building a house from aerated concrete Project of a two-story house 10 by 10 from aerated concrete

built country house on frame technology plus a small veranda. The cost came out quite economically, and in terms of 3 and a half months. Finished even a couple of weeks earlier than promised. We go to the country house only in the summer, so I can’t say anything about thermal insulation. Thanks

Thank you so much for building a house of aerated concrete. The quality of both material and work is excellent - FRIENDS ENVY. The terms of the work performed - in about 4.5 months a house was built from scratch. Good luck to all of you good clients and big houses!!


They built a house for us in 3 months (they started the foundation at the end of summer, and in the fall they finished the walls and interior decoration), it turned out not cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse with them! Thank you for such professional guys that you provided us!


Thank you so much for your hard work and dedication! Everything is prompt, high-quality, fast! Thanks to the team led by Alexei!


The company built a great summer house for me! I have no complaints about the company, next summer I am going to build a bathhouse and a garage, I will definitely contact them. Thanks to everyone, especially Sergey's team, which built for me, a lot depends on them!


We built a house of aerated concrete in your company - very satisfied. A house was built on our pre-prepared foundation in 45 days. And as a gift received home insurance for a year. So I recommend.


In August 2017, I ordered a foundation ( monolithic slab) for a house in the Leningrad region. In 2018, I already ordered the house itself. I can recommend, because were satisfied with the result. Everything was done quickly and professionally.


We ordered a house and a garage in this company in the summer of 2016. The builders worked for about 4 months without a break (they liked it very much). Everything was done according to the contract, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been operating?

Our company began work as a repair and finishing company in 2007. From that moment we have grown to the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

What confirms the competence of specialists?

All architects and engineers of the company have qualification certificates. Because the project is not accompanied by a company license, but by an architect's certificate. By law, the architect is responsible for the project.

Does your company do all the work? Or are you hiring contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring engineering systems(electricity, home heating, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: the production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Search, attraction, compliance with agreements and control over the performance of work by contractors is our task.
  • We carry out 80% of all works on the construction of your house on our own and only 20% involve contractors.
  • We conclude an agreement with each contractor, in which he indicates a guarantee for the work performed by him, and in case of malfunctions, their elimination lies with the contractor.

Can I see the objects that are currently in operation?

Yes, there are objects that we can show at different stages of work and houses that have already been handed over by prior arrangement.

about the project

Buy a standard project or order an individual one?

Buy a finished project.

  • The plus is the price.
  • Minus - it will not provide for all your wishes regarding materials and layouts. Also, it will require refinement for the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. It is possible that it will be more profitable for you to develop an individual project than to modify a typical one.

The cost of such improvements should be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all the characteristics of the house and the site are taken into account.
  • Minus - the cost of such a project is higher than a typical one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free of charge for you.

How is the development of an individual project?

  • The development of an individual project begins with the signing of the contract and the first meeting with the architects, at which the client voices his wishes. As a result of the meeting, a design task is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move on. During the entire design period, several meetings with the client take place, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a Working Draft is being developed. This is the calculation stage of each design solution, in which the client is not involved.
  • This whole process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when applying for a building permit.

About construction

Will you travel to the site where the construction is planned?

Yes. When inspecting the site, we take into account the dimensions, the entrance from the road and its width, the proximity of neighbors' buildings, the presence of a slope or difference, cardinal points and what kind of soil is on the site.

Do you help with the selection of a building site?

Yes. Our experts help with site selection. They will help you find it according to your requirements on the Internet with ads.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, conditions of entry, location
  • materials used in construction
  • house architecture features
  • conditions for the production of work (limitations on work time)

What guarantees do you give?

We give a guarantee of 3 years for our work. The warranty is given by the manufacturer and it is different in each case. There are materials for which the manufacturer gives a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the object 24 hours a day, you and the company's specialists have access to it (paid service).
  • You can also use the services of companies that carry out technical control.
  • The construction is being delivered in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimate.

When do I have to pay for your work?

For design, an advance payment must be made within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid when the finished project is handed over to the client.

Payment for construction is broken down according to the stages that are specified in the estimate. Each stage of construction is also divided into payments, the amount of which may be different (usually this is due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders next to the construction site, suitable garden house, construction trailer, old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will place our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a capacity of at least 5 kW and industrial water.

If not, we will bring our generators for FREE. Water in most cases in wooden construction is used only for household needs, we will provide its delivery on our own.

What time of year do you build?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save money by correctly calculating the estimate and choosing high-quality materials.

Perform high-quality design documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Egoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Luberetsky district, Mozhaysky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovsky district -n, Ozersky district, Orekhovo-Zuevsky district, Pavlovsky Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posadsky district, Serebryano -Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldom district, Chekhov district, Shatursky district, Shakhovskoy district, Schelkovsky district.

Aerated concrete - widely demanded modern material. Dachas are erected from it for temporary residence and durable capital houses. In any case, the use of this material allows the implementation of practical and profitable projects.

This is a building product in the form of blocks, shaped like bricks. They are easily identified by their white color and rough surface. The structure of aerated concrete is porous. The main components of the material are cement and sand. Aluminum powder is used to obtain air cells. Lime is also involved in the reaction that results in the formation of pores. The highest quality is the product that has been autoclaved and treated with steam under pressure.

Which aerated concrete to choose for building a house

For the construction of the same building, products of different brands can be used. The walls are made of denser blocks M500-M600. It is advisable to install partitions that do not bear such a large load from fragments marked M300-M400. The thickness of such "bricks" is not more than 200 mm.

Models are available with grooves and ridges to facilitate masonry, and without them. You can choose any aerated concrete, but the option with additions will come out a little more expensive. As for the manufacturer, products from popular brands usually cost more. The location of the plant also matters - logistics costs are also included in the total cost.

Advantages and disadvantages of aerated concrete

The structure with voids gives lightness to the material. It is convenient to work with him, and there is no need to attract powerful lifting equipment. The created structure weighs relatively little, so the cost of building a foundation is reduced. The building is warm and durable. The material of inorganic nature is not afraid of rot and rodents. It is absolutely non-toxic.

Among the shortcomings called fragility. Because of this, it is worth purchasing material with a margin. Aerated concrete is also hygroscopic. It quickly absorbs moisture, which makes finishing work difficult. The way out is the preliminary priming of the modules.

How much does it cost to build a house from aerated concrete?

The material is valued at an affordable cost. A house will come out of it cheaper than, for example, from a bar or a brick. However, it all depends on the complexity of the layout, the type of foundation, the cost of expendable materials and other factors. On average, the cost of work is 20,000 - 24,000 thousand rubles / m2. I mean a turnkey project.

Our company "Krasnovodsk-DomStroyProfi" specializes in the construction of strong and durable houses from aerated concrete. With extensive experience, we fulfill orders in the shortest possible time. For our clients, we hold various promotions and provide discounts for individual projects. Order construction in our successful company and get a house with excellent performance.

Building a house from aerated concrete is one of the most economical options for private construction, based on the low cost of foam materials. But the construction of the box is only 30% of all work.

A huge part of the funds is directed to the installation of the roof and the finishing. It all depends on the complexity and intricacy of the project, the chosen type of foundation and roofing material, finishing works and progressivity of building materials, number of floors, total area and other structural features.

Estimate for the construction of a house made of aerated concrete 10x10

A house of 10x10 meters can be one-story, with an attic (f.1) or built on two floors (f.2). Such a structure freely accommodates a family of 4-6 people on its territory. Let's try not to miss any important points when forming an estimate for the construction of a 10x10 aerated concrete house. The erection of such a building must be divided into stages in which it is necessary to adhere to manufacturability and the time period for the “strength” of the foundation.

1. Site preparation and foundation

To perform this type of work, you need to select the type of foundation. Due to the lightness of the foam blocks, any type of base will do. The most acceptable is the tape or monolithic type of foundation with basement waterproofing (form 3.4).
The budget for the construction of the foundation consists of:

  • conducting exploratory studies of the terrain and soil;
  • territory planning with breakdown of axes;
  • earthworks (mechanized or manual digging of a ditch, device sandy base with a tamper, a layer of crushed stone);
  • formwork installation;
  • erection of a belt of interlaced reinforcement;
  • pouring concrete.

Photo 1 - Tape type of foundation
Photo 2 - Foundation monolithic slab

Photo 3 - Cottage with attic
Photo 4 - Two-storey house aerated concrete

At the same time, the cost of renting formwork and the price of building materials are taken into account:

  • fittings of class A500 with a diameter of 12-16 mm and fittings d8mm for tying or knitting wire d6-8 mm;
  • concrete;
  • waterproofing;
  • sand, gravel.

When determining the cost of materials, it is necessary to take into account the cost of their delivery and, in some cases, unloading.

2. Frame erection

When drawing up an estimate for the construction of a 10x10 aerated concrete house, the cost of materials and work on their installation, delivery, unloading is taken into account. For the construction of the frame, the cost is calculated:

  • aerated concrete blocks;
  • glue;
  • laying of cellular aerated concrete;
  • materials for the installation of a reinforced belt or installation of columns;
  • metal for window lintels.

Recently, a popular construction technology is the construction of a monolithic foundation, connected together with corner columns or pylons. For a 10x10m house, the construction of 4 load-bearing columns will be sufficient. They are erected using special column formwork kits. A 10x10 house with a wall height of 3 meters will take 10x4x3 = 120 sq.m of area bearing walls excluding openings attributable to windows and doors. For construction, gas blocks with a density of D500 and a thickness of 375mm are suitable. For partition walls, blocks with a smaller thickness are taken. Knowing the block sizes that offers best manufacturer, you can count the number required material. The amount of glue is determined based on the manufacturer's recommendations.

Photo 5 - Cladding options
Photo 6 - An example of a general estimate for the construction of a 10x10 aerated concrete house

Photo 7 - Sample estimate. Section 1. Foundation
Photo 8 - Sample estimate. Section 3. Walls and partitions

3. Installation of ceilings

To make the house strong and reliable, it is connected together by a frame. At the bottom, the structure is strengthened by the foundation, on the sides - by columns, and at the top - monolithic ceiling. This technology has justified itself and is now used in private, low-rise construction and in the construction of high-rise buildings and industrial facilities. When planning estimates for the construction of a 10x10 aerated concrete house, you should determine the cost of the floor, which includes:

  • formwork for floors;
  • fittings and knitting wire;
  • concrete;
  • insulation laid around the perimeter of the building.

An experienced team of builders will perform a monolithic vault quickly and efficiently.

4. Roof installation

The most responsible and costly stage is the installation of the roof. In connection with the chosen option of a hip, tent, multi-gable, domed roof, the cost of materials and components is taken into account. The main components in the estimate are the cost:

  • coating material (metal tile, slate, tile);
  • truss system;
  • accessories for a drain and other elements;
  • structures for chimneys, ventilation;
  • nails, screws.

Photo 9 - Sample estimate. Section 3. Walls and partitions
Photo 10 - Sample cost calculation. Section 4 Overlap

Photo 11 - Example of cost calculation. Section 5. Roofing
Photo 12 - Example of cost calculation. Section 6. Windows and blind area

5. Facing

Gas silicate blocks rapidly absorb moisture, therefore experts recommend not tightening the outer cladding of the building (form 5). It can be done with insulation and facing tiles. You can simply cover the house with plaster and paint. Therefore, the estimate for cladding includes the cost of:

  • external facing material;
  • internal plastering with wall and ceiling decoration;
  • floor devices;
  • windows, doors;
  • stairs.

Conclusion

The total amount of expenses received at each stage is called the total estimated cost. In practice, it is very difficult to "fit" into the estimates. In order not to violate the general calculations, some builders reduce costs where technology allows, directing the necessary amounts to other areas. Sometimes it is necessary to increase the estimate in agreement with the customer. For clarity, we give an example of estimated estimates for some main sections during the construction of a one-story residential building with an attic with total area 120 sq.m. (f 6-11). The drawings are made on the basis of the information given.

Advantages of the finished house project 10 by 10

1. The project is easy to build and control the construction site. There are no extra protrusions. Simple roof.

2. building materials calculated taking into account typical factory dimensions

3. There are already built houses according to this project. See photos below.

4. Square plan saves heat and reduces heating costs.

5. The project was developed for the size of aerated concrete blocks, so that the blocks had to be cut as little as possible.

6. There is not a single expensive metal beam in the project of the house.

7. The dimensions of the house are 9.9 x 9.9 meters.

8. The staircase is comfortable with a platform.

9. Sewer riser in one place.

10. The roof is gable - there are almost no scraps of metal tiles, there are no places that could leak. Roof prices below.

Characteristics

House plans 10 by 10:

Ground floor plan:

Second floor plan:

The house will look good both completely in plaster and in combination with wood. The house will look more attractive with decoration with natural materials or as close as possible to those. As a roofing material, it is better to prefer composite tiles, as they are less noisy than metal tiles and look like natural tiles after installation. For finishing the plinth, choose natural stone.

The cost of the roof for the house project M142

For the sake of interest, the roof for this project was sent to be calculated by several roofing companies. Counted 01/19/2016. Video of the cost of the roof for this project.

Monterrey metal roofing, taking into account additional elements for this house: 82,936 rubles.

Installation of a roof made of metal tiles: 44,625 rubles.

Soft roof Shinglas: 141,721 rubles.

Mounting soft roof: 100 230 rub.

Composite tiles: 222,289 rubles.

House design questions

Can a garage be attached to the house?

Yes it is possible. We have an option for a house with a garage. The exit from the garage to the house can be done under the stairs.

Is it possible to make the second floor not an attic? Raise the roof.

No. With a gable roof, it is better not to do this. Look at the options for houses with hipped roofs. .

Can the balcony be removed?

The balcony can be easily removed and a canopy over the terrace can be made.

The project of a house made of gas blocks, but can it be replaced with another material?

A house can be made from almost any material: ceramic large-format blocks, the so-called warm ceramics, wood concrete blocks, cinder blocks, bricks, etc.. We will make changes to the project for the wall material you need. We do not change only for heat blocks.