geberit installation cistern device. Maintenance and repair of toilet installation. Installation of the frame structure

The Geberit installation is used for the hidden connection of mounted plumbing to the water supply, electricity, and sewerage of the house. The installation may contain a flush tank, branch pipes, fittings for connection to the engineering systems of the building, flush keys, mixers for nozzles of a bidet built into the toilet bowl.

The installation system is a set of profiles rigidly interconnected into a single frame structure with the possibility of adjusting the spatial position of individual elements. The installation is used for attaching suspended plumbing fixtures, hidden plumbing to toilet bowls, urinals, bidets, sinks, cold water and hot water communications, sewerage, and electrics.

The Swiss manufacturer Geberit produces installations for fixing the following types of plumbing and fixtures:

  • toilets and;
  • urinals, bidets;
  • washbasins, drains, kitchen sinks;
  • bathtubs, shower systems;
  • shower with sewerage in the wall;
  • supports, handrails for the disabled.

The frame structure is separated from the wall at some distance or mounted as an island, sheathed on the outside with sheet material. This allows you to hide pipes, cables, flexible hoses, and other elements of engineering systems inside it.

Users often get confused with the name of Geberit installations. The correct name for the frame structure is Geberit Duofix. However, the manufacturer initially uses several options for completing it with mounting elements for specific plumbing equipment. Therefore, other names of his products appear in the title. The marking of the frame structure is deciphered as follows:


In other words, in the frame structures of the installation systems, the distance between the uprights and the horizontal bars can vary. The frame can be reinforced with two side posts for fixing handrails for people with disabilities.


Frame construction with handrails for the disabled.

In free-standing installations, racks are usually reinforced with additional elements. The flush cistern key can extend to the front surface of the structure or be located on top or on the end.

All these factors affect the time of installation installation, the complexity of the work, the selling price of the frame structure kit.

Installation of the Geberit installation

The installation for the toilet bowl is installed on a place prepared in advance for this. Special tools and fixtures are not required. A minimum qualification of a home master, a standard arsenal, usually available to the average user, is enough.

Instruments

Each Geberit installation kit is designed with low installation time in mind. To do this, the number of fasteners has been reduced, standard hardware, traditional technologies are used. Home master for installation installation on your own tool required:

  • level - bubble or laser;
  • tape measure - maximum 3 m;
  • marker or construction pencil - any color visible on the surface of the walls, flooring;
  • perforator - chipper, drilling, impact drilling mode;
  • head set or wrenches- 10 - 17 mm;
  • screwdriver - cordless or mains;
  • screwdrivers - cross-shaped, flat;
  • hacksaw - a blade for metal or plastic.

Attention: At the stage of rough finishing, you will need a clerical or carpenter's "jamb" knife to cut the sheet material with which the tubular frame is sheathed. Holes for pipes in drywall can be cut with a knife or drilled with crowns.

Training

Before buying a Geberit installation, you need to consider the nuances:


The main task of the installation is a hidden wiring of communications, so everything engineering systems should be behind its tubular frame. That is, if pipes come out of an installation sheathed with plasterboard, tiled, there is no point in installing it.

Therefore, several options for implementing projects with installations are used:


Attention: Shut-off valves and water meters in 90% of cases are located near the toilet, for which the installation is used. They need access, so it is necessary to leave a place near the frame for a revision plumbing hatch.

Frame structures are fixed at least two points to the floor and two points to the wall. This allows you to withstand from 500 kg of operational load in the process of using suspended plumbing.

Installation of the frame structure

In this example, the Geberit installation was integrated into a false plasterboard panel, reaching the height of the window sill.

The sequence of actions for transforming the interior is as follows:

  • dismantling of existing plumbing;
  • dismantling of facings of enclosing structures;
  • assembly of the frame structure;

  • the bottom stop is set at a height of 100 mm from the floor;

  • adjusting the height of the structure - 1 m to the upper mark on the right rack of the installation;

  • horizontal level adjustment;

  • marking the fastening of the upper supports to the wall;

  • markings for fastening the lower stops;

  • drilling blind holes for fasteners;

  • holes are filled with liquid nails to fix hardware;

    Application of adhesive on the surface of the holes.

  • installation of polymer dowels in holes;

    Installation of plastic dowels.

  • re-applying the adhesive;

    Refill with glue.

  • installation of a frame structure at the place of operation;

    Mounting the installation in place.

  • fixing stops with anchors in dowels;

    Fixing with anchors stops.

  • adjustment of the frame distance horizontally;

    Correction of the vertical position of the frame.

  • installation of sewer outlet 90°;

    Installation of a branch pipe for connection to the sewerage.

  • installation of studs for fixing the toilet bowl and the upper pipe from the flush tank;

  • connection of the flush tank to the cold water supply;

    Installation of corrugations from the water supply to the flush tank.

  • wiring communications inside the flush tank;

    Connecting hoses to the flush system.

  • installation of a panel with flush keys;

At this point, the installation of the Geberit installation is considered complete.


The manufacturer has provided three options for connecting the flush tank to the water supply - right, top, left. The outlet of the pipes to the outside is adjustable.

sheathing

After installation, the Geberit installation is checked for functionality without a toilet. To do this, water is drawn into the tank, at the same time, the water level inside it is adjusted. Then, a small, large, general (cascade) flush is carried out into a bucket of sufficient volume, depending on the modification of the tank.

Only after that you can decorate the installation:

  • galvanized profiles-racks are attached to the wall;
  • GKL sheet is attached to the frame and profiles with self-tapping screws;

The corrugated part of the pipes is cut to length, taking into account the thickness of the wall cladding (usually tiles + a layer of tile adhesive).

After finishing the walls with tiles, wallpaper, flexible stone, cork, panels, etc. facing materials a toilet bowl is put on the studs, fastened with nuts with polymer washers.

This method of installation provides high maintainability of plumbing and cladding. However, if the water supply breaks, you will have to dismantle the drywall in the emergency area.

Details about the sheathing of the installation with drywall.

Possible problems

When installing a Geberit installation, the following problems may arise due to the low qualifications of the builders of the building, finishers, plumbers, and the home master himself:


With a high cross, the installation is usually shifted sideways from it to solve the problem:


By changing the bending angles, it is possible to connect the outlet pipe of the toilet bowl with the opening of the sewer cross with three bends, almost at the same horizontal level. In this case, the design of the installation should be taken into account.

In the usual Geberit Duofix fastening system, the racks are single, the regular elbow with corrugation (black) can be scrolled towards the cross at any angle for docking with the other two bends of the considered option.

In a reinforced installation, two racks are used, the length of the standard outlet is not enough for rotation, it can only be mounted vertically.


The double frame of the reinforced installation does not allow the nozzle to be rotated.

In this case, a 120 degree elbow is used instead, as shown in the lower figure.

When cutting standard pipes - a diameter of 40 mm for drain tank, 110 mm for sewage, it should be noted that their length is different. The drain is closer to the sewer outlet. Therefore, it is better to cut the bends from the installation kit last - after plasterboard and tile sheathing, immediately before installing the toilet bowl.

Plastic adjusting pins for attaching the button are also cut off after the box is tiled.

Thus, the installation of the Geberit DuoFix installation system can be carried out in-house. Avoid mistakes, follow the instructions contained in each installation kit.

Advice! Such products are mass-produced, so you should not worry that there will not be any parts during repair, especially since everything you need is included in the package.

There are several modifications produced, and each has its own individual technical features but the principle of their work is the same. The main difference is their type. It happens:

  1. block;
  2. frame.
  • The first type has one significant drawback, since it can be mounted exclusively on main or load-bearing walls. Do it in , located in the central part Houses or , impossible.
  • The second type is devoid of this shortcoming, but has some reservations when fixed.

In addition, there are options that differ in appearance, which allow you to put toilet bowl not against the wall, but in the corner.

It is easy to find out this or that option for sale: the block one is devoid of a sliding frame and consists exclusively of such components as:

  1. fittings;
  2. fasteners;
  3. decorative accessories.

Choose a mount depending on the place where you plan to install plumbing.

Training

Before starting the main process, it is necessary to prepare the workspace and acquire the appropriate tools. You will need the following:

  • perforator;
  • with drills (including for concrete);
  • building level;
  • roulette;
  • wrenches of the appropriate size;
  • knife and grinder with nozzles for cutting drywall;
  • putty knife;
  • marker.

From additional Supplies useful:

  1. dowels installed in mounting holes;
  2. silicone sealant;
  3. mounting foam;
  4. screws for plasterboard;
  5. finishing .

If the procedure is carried out in a residential area, first of all you need to dismantle the old toilet seat and remove it.

The next step may be to move the sewer hole in accordance with the plan. This can be achieved using special devices - adapters made of plastic.

Note! This procedure will require the dismantling of the part.

To do this, the floor around the hole is deepened with a puncher and the adapter is fixed on it. Further free space pour around it cement-sand mortar or self-levelling floor compound. It will be possible to proceed to the next stage after the final drying of the solution.

How to assemble a frame model for a wall hung toilet?

  • From the component materials, a frame is assembled, on which it is attached tank. You can adjust the height, horizontal and vertical position using the included brackets and screws fixed to the frame.
  • The finished product will reach almost one and a half meters in height. At the same time, its components will be at the following height from the floor level according to the standard:
  • In the case of using non-standard plumbing fixtures, these values ​​\u200b\u200bcan be adjusted in the same way as the distance between the eyes of the toilet seat. To extend the service life, professionals recommend replacing metal racks with plastic ones if the appropriate size is available.

Note! It should be noted that a technological gap of 2 cm is required between the floor and the assembly.

  • Next is the installation of the product. This must be done with a clear adherence to the horizontals and verticals. If necessary, a level, a plumb line and a marker are used for this, which mark mounting points and lines. On them, the finished frame is screwed to flooring in pre drilled holes with dowels installed in them.

Important! When drilling holes in the floor, remember that communications or a heating system can run inside it. In case of damage, the front repair work may triple.

  • Do not forget that the height of the frame and horizontal alignment varies with screws, but check the quality of work building level.
  • Then you will need to connect the water supply using a flexible hose, and the appropriate complete fittings to the outlet from the sewer. If necessary, it can be replaced with a corrugated analogue, after which a final check for tightness of the joints can be carried out.
  • Finally, plug the holes and install the mounting pins.

How to build a block model?

A feature of this type is its versatility. In most cases, it can be used for floor and wall mounted toilets, however, the installation will vary slightly.

  1. First, you need to markup, namely, apply the axis of symmetry and, in accordance with it, apply other points and lines. Their position and the required distance between them can be found in the complete instructions. According to the established marks, holes are drilled or punched with a perforator, and dowels are installed in them for.
  2. Next, you need to fix the drain tank and connect it with a hose to the water supply.
  3. At the final stage, for a hanging toilet seat, you need to screw in the pins, and in the case of a floor toilet, make new marks on them in order to subsequently drill them and fix the fasteners, having previously done the same procedure with the knee. To connect them, a special fitting called a cuff is used.

On a note! It may also be necessary to cap the bolts and connect a button if this was not done by the manufacturer.

The Geberit company appeared at the end of the 19th century. At the present time, this brand is associated with very high quality, because over the years the company has gained an excellent reputation. Among modern consumers, Geberit installations are very popular: this equipment is reliable and durable. In order not to be disappointed in the results installation work, when installing the installation, you need to take into account certain rules that will be discussed in this article.

Peculiarities

The Geberit installation looks like a frame made of metal frames, on which a sink, wall-hung toilet or other sanitary ware is installed. All communications that are needed in a particular case are connected to this equipment. A drain tank is also attached to the frame.

Much of the structure is hidden, and for this reason, such equipment does not spoil the design of the room. The frame itself is usually attached to a main wall or plasterboard partition. It is in a vertical position.

Advantages

Geberit installations have many advantages.

  • Long service life. The company guarantees uninterrupted operation of the equipment for ten years.
  • Maximum reliability. You don't have to worry about the structure ever falling down.
  • Saving space in the room.

  • The ability to purchase various components: gaskets, fasteners, an exhaust valve to eliminate leaks, and so on.
  • The ability to use such a system to hide defects in the finish.
  • Ease and speed of assembly.
  • No risk of leaks.
  • Aesthetic appearance of the structure.

One of the main advantages of such installations is the regulation of water drainage. With the help of a special button, you can control the flow of liquid.

Frame types

There are the following types of such systems:

  • Frame. These structures are attached to load-bearing or main walls;
  • Block. Such systems are kept on plasterboard walls, thin partitions;
  • Universal. These installations are suitable for various walls.

The manufacturer creates structures that can be placed in a variety of places in the premises - even under the windows. For this purpose, equipment is intended, the height of which is up to 82 meters. Omega systems belong to this variety.

Designs from the Delta series can be attributed to the economy class, they are set at relatively low prices, but at the same time, in terms of quality, these structures are in no way inferior to other products from Geberit. The lower supports of such systems are reinforced, they are suitable for installation on plasterboard sheathing.

The Plattenbau collection is designed specifically for buyers from the CIS countries. Such structures can be installed in walls with plumbing shafts. The manufacturer takes into account the thickness of the walls, partitions. The depth of Plattenbau structures does not exceed 12 cm.

Products from the Duofix collection are also popular. These systems are designed specifically for drywall partitions. Hanging toilet bowls can be mounted on such structures. Such plumbing products are very convenient, because dust will not accumulate on the toilet leg.

The Duofix system can be installed in such a way that it is suitable for people with disabilities. The toilet is mounted so that the load is distributed on the side racks and on the floor. For this reason, you do not have to worry that the hanging product will fall.

Constructions from the Kombifix collection are very well suited for installation in front of or in brickwork. Such a system can be attached to the floor or to the wall.

Instruments

Geberit structures can be installed independently, without the help of professionals.

To do this, you must first prepare all the tools necessary for work:

  • perforator, drills;
  • marker (to make markup);
  • building level;
  • cap keys;
  • plumb, tape measure.

frame construction

First you need to choose a place where the structure will be installed. When choosing a suitable installation, the thickness of the partition or wall should be taken into account. It will also be necessary to pay attention to the features of the sewerage system.

Installation work must be carried out in a certain order.

  • Assemble the frame. It will be necessary to make a frame of metal, where the movable fasteners are located. The drain tank will be fixed on them. Since the fasteners are floating, you can set a suitable height at which the sanitary ware will be fixed. The frame can withstand a very significant weight (up to 500 kg).
  • Then you need to install the tank. A small distance should be left between the wall and the tank (about 15 mm). Position the drain button at a distance of 100 cm from the floor.

  • Attach the assembled structure to the wall. To do this, you need to use the building level. First, bring the frame to the wall and mark where you will make the mounting holes.
  • Lead the pipeline to the tank. The direction is lateral or top. It is better not to choose flexible hoses for connecting the tank, otherwise it is quite possible that these elements will fail in the shortest possible time. It is recommended to opt for plastic pipes.
  • Then the system must be connected to the sewer. For this, corrugation is used.

  • Check how the installation works. Inspect all connecting elements: there should be no leaks. If everything is in order, you can close the frame.
  • Carry out the installation of drywall boxes. The frame for the box must be metal profile. It is recommended to stop the choice on drywall, which differs increased stability to moisture (especially in cases where there is both a bath and a toilet in the same room). It is better to choose sheets with a thickness of 10 mm. You can lay drywall in two layers. It is necessary to pre-cut all the necessary holes in the sheets.
  • Install a toilet. Installation can be carried out approximately ten days after the installation of the box. The sanitary ware should be installed on pins. You can clad the box before or after installing the toilet.

Installation of a block structure

The installation of a block system will take a minimum amount of time.

This work will need to be done in the following way.

  • Decide where exactly you will install the structure. It should be borne in mind that the axis of the structure must coincide with the axis of the room.

  • Mark where the tank will be. Usually the height does not exceed 100 cm. Screw the dowels at the same distance from the axis. Holes should be made with a puncher: then you need to hammer dowels into them.
  • Carry out the installation of the tank.
  • Mount the pins: the toilet will be attached to them. Attach a bowl to the plum. Clamps must be used to attach the hose.

Possible problems

Geberit products should be purchased from a branded or certified store. It is not recommended to choose designs that are too cheap or go to unreliable sellers, otherwise it is quite possible that you will receive a low-quality product.

Owners of Geberit systems sometimes face different situations.

  • The plumbing fixture starts to wobble. It is very easy to deal with this problem: you just need to correct the fasteners, tighten them;
  • The liquid stagnates in the sewer drain. This means that the slope of the pipes is not correct. Usually it is 45 degrees;
  • The drain tank is leaking. In such a situation, it will be necessary to check whether the gaskets are installed correctly;
  • The toilet is leaking. It is possible that there is not enough sealant at the joints. To fix this problem, sand the seams and reuse the silicone.

Designed for concealed installation, Geberit products will serve you for many years thanks to their high quality and reliability.

Plumbing work always raise a lot of difficult questions even among masters who have been engaged in such activities for years. An example is newfangled fixtures such as the Geberit installation. Special problems arise if the instruction is missing or it is in an incomprehensible language. Therefore, we look further and learn the basics.

  • Design features
  • Training
  • How to assemble a frame model for a wall hung toilet?
  • How to build a block model?
  • Completing the installation
  • findings

Mosaic in the interior of the hygiene room

Design features

This design is quite new and appeared in modern life quite recently thanks to wall hung toilets. It is a set of interrelated details hidden behind a self-created decorative wall based on drywall. Thanks to its special structure, it allows you to securely fix plumbing and connect it to water supply and sewerage without any problems, and most importantly, it will replace the traditional bulky, inconvenient to use flush tank.

Advice! Such products are mass-produced, so you should not worry that there will not be any parts during repair, especially since everything you need is included in the package.

There are several modifications produced, and each has its own individual technical features, but the principle of their operation is the same. The main difference is their type. It happens:

  1. block;
  2. frame.


Hidden installation system

  • The first type has one significant drawback, since it can be mounted exclusively on main or load-bearing walls. It is impossible to do this in a bathroom located in the central part of a house or apartment.
  • The second type is devoid of this shortcoming, but has some reservations when fixed.

In addition, there are options that differ in appearance, which allow you to put the toilet not against the wall, but in the corner. toilet room.


Wall hung toilets are very popular today.

It is easy to find out this or that option for sale: the block one is devoid of a sliding frame and consists exclusively of such components as:

  1. fittings;
  2. fasteners;
  3. decorative accessories.

Choose a mount depending on the place where you plan to install plumbing.

Training

Before starting the main process, it is necessary to prepare the workspace and acquire the appropriate tools. You will need the following:

  • perforator;
  • screwdriver with drills (including for concrete);


Installation is best left to professionals.

  • building level;
  • roulette;
  • wrenches of the appropriate size;
  • knife and grinder with nozzles for cutting drywall;
  • putty knife;
  • marker.

Wood in the interior of the toilet room


Stylish bathroom combined with a toilet

Of the additional consumables will come in handy:

  1. dowels installed in mounting holes;
  2. silicone sealant;
  3. mounting foam;
  4. screws for plasterboard;
  5. finishing putty.

If the procedure is carried out in a residential area, first of all, you need to dismantle the old toilet seat and remove wall cladding.


Removing an old toilet


Removing old wall cladding

The next step may be to move the sewer hole in accordance with the plan. space planning and design. This can be achieved using special devices - adapters made of plastic.


Sewer fittings

Note! This procedure will require the dismantling of a part floor covering.


Recess for wall installation

To do this, the floor around the hole is deepened with a puncher and the adapter is fixed on it. Next, the free space around it is poured with a cement-sand mortar or a self-leveling floor mixture. It will be possible to proceed to the next stage after the final drying of the solution.

How to assemble a frame model for a wall hung toilet?

  • From the component materials, a frame is assembled on which the tank is attached. You can adjust the height, horizontal and vertical position using the included brackets and screws fixed to the frame.
  • The finished product will reach almost one and a half meters in height. At the same time, its components will be at the following height from the floor level according to the standard:
  • In the case of using non-standard plumbing fixtures, these values ​​\u200b\u200bcan be adjusted in the same way as the distance between the eyes of the toilet seat. To extend the service life, professionals recommend replacing metal racks with plastic ones if the appropriate size is available.


Assembly diagram of the frame model

Note! It should be noted that a technological gap of 2 cm is required between the floor and the assembly.

  • Next is the installation of the product. This must be done with a clear adherence to the horizontals and verticals. If necessary, a level, a plumb line and a marker are used for this, which mark mounting points and lines. According to them, the finished frame is screwed to the floor covering in pre-drilled holes with dowels installed in them.


Marking and installation of the frame model


Tank and sewer connection


Toilet connection

Important! When drilling holes in the floor, remember that communications or a heating system can run inside it. If they are damaged, the front of repair work can triple.

  • Do not forget that the height of the frame and horizontal alignment varies with screws, and the quality of the workmanship is checked with a building level.
  • Then you will need to connect the water supply using a flexible hose, and the appropriate complete fittings to the outlet from the sewer. If necessary, it can be replaced with a corrugated analogue, after which a final check for tightness of the joints can be carried out.


Pay special attention to the quality of flexible hoses

  • Finally, plug the holes and install the mounting pins.

How to build a block model?

A feature of this type is its versatility. In most cases, it can be used for floor and wall mounted toilets, however, the installation will vary slightly.


Markup for the box model

  1. First, you need to markup, namely, apply the axis of symmetry and, in accordance with it, apply other points and lines. Their position and the required distance between them can be found in the complete instructions. According to the established marks, holes are drilled or punched with a perforator, and dowels for fasteners are installed in them.
  2. Next, you need to fix the drain tank and connect it with a hose to the water supply.
  3. At the final stage, for a hanging toilet seat, you need to screw in the pins, and in the case of a floor toilet, make new marks on the floor, in order to subsequently drill them and fix the fasteners, having previously done the same procedure with the knee. To connect them, a special fitting called a cuff is used.


sheathing finished construction drywall

On a note! It may also be necessary to cap the bolts and connect a button if this was not done by the manufacturer.

Completing the installation

After all the components are installed, mounted, fixed and checked for leaks, proceed to the formation plasterboard sheathing. For fastening the GKL, it may be necessary to assemble a frame based on metal profiles.

Advice! Choose upholstery that is water resistant. This will extend its service life.


The tile is perfect for decorating the bathroom

In drywall sheets, cutouts of the appropriate size must be provided for:

  1. pins;
  2. bowl outlet;
  3. drain entrance;
  4. keypad.


Hole cutting

The Swiss company Geberit has been successfully manufacturing and selling various sanitary equipment for many years.

For example, the company produces components for flush tanks, supplying parts for various global concerns, as well as independently creating finished products.

enjoys great popularity Geberit system for toilets. High performance and reasonable cost make these devices very popular in the market.

More about fittings

The structure (Geberit drain fitting) in the toilet cistern works when flushing occurs. The drain mechanism consists of the following elements:

  • A tank is a container in which water is stored. The water hose can be connected either from below or from the side. As a rule, the volume of the tank is about 8-10 liters.
  • The locking system is a mechanism responsible for filling the tank, as well as stopping the water supply when its level reaches a predetermined maximum.
  • Flushing system - works when the button is pressed or the lever of the button is raised - depending on design features execution.

Lever models are now produced less and less - they are being replaced by modern push-button models, which are more convenient, look more beautiful and allow the use of flush modes. When exposed to the button (lever), a hole opens through which water from the tank enters the toilet bowl. The opening closes when the container is empty.

Almost always the system is offered as a kit, already assembled and ready for operation. If it fails, it can be replaced separately.

It should be borne in mind that if Geberit was installed, then you need to change it to the same one.

The drain system consists of two main elements: a lever and a siphon. The latter is needed to prevent water leakage: it closes the drain hole. As a rule, the type of siphon resembles a plunger.

The button lever activates the siphon, which rises and opens the drain.

Recently appeared additional element, which is connected to the button (as mentioned above). Pressing it activates the button lever, which raises the siphon.

Moreover, many models are equipped with double buttons - which allow you to empty the tank completely (when fully pressed) or partially (respectively, with partial).

Product classification

One way to classify the drain mechanism is the material of manufacture. The most common are plastic and bronze. These types of products do a great job with the tasks assigned to them.

The use of such materials is relevant for the reason that they are neutral to corrosion under the influence of moisture (unlike metal structures).

Geberite are high-quality plastic elements, and in terms of strength characteristics they are almost as good as bronze.

You can also classify the drain mechanism (tank) according to design features:

  • push-button - modern solution: draining occurs by pressing the button (tank);
  • exhaust (lever) - an outdated example when you need to pull the lever rod up.

Installation (push-button options) is divided into types:

  • full descent - when the button is pressed, the entire volume of the tank is drained;
  • dual-mode use - the button is divided into two parts, which makes it possible to use only a part of the volume of water in the tank: the first time you press the water starts, and the second - the supply to the tank stops.

In addition to the options considered, there is another modern solution - installation. It is a complex system for concealed installation of sanitary equipment.

Due to the special design, a number of advantages are formed:

  • communications are aesthetically hidden;
  • the space in the bathroom is saved - which is very important, given that the space in them is often very, very small;
  • plumbing fixtures - suspended;
  • simple installation and adjustment of Geberit fittings.

The installation distinguishes between two types of installations:

  • block - a tank with a mount; implies fixation on the main wall, the elements are hidden in a niche, only a drain button and leads for connecting communications are displayed;
  • frame - allows installation on the main walls, as well as on the tank or its partitions. There are corner models: with fastening on two walls.

The block system costs less, but the frame system opens up more possibilities for use.

Frame fittings (installation) for the Geberit toilet bowl are produced in three types:

  • universal;
  • for installation on lightweight walls, such as plasterboard;
  • to fix on load-bearing walls, for example, brick.

With regard to Geberit installation systems, two main groups of devices can be distinguished:

  • for sinks, urinals - a universal option for connecting plumbing equipment from different manufacturers;
  • for wall hung toilets- flushing tank and key.

Nuances of choice

You need to choose drain fittings, focusing on the toilet model. After all, the solution must be approached constructively - different models cannot be docked in any way.

So, if the use of a classic toilet bowl is supposed to be used, then the appropriate drain fittings should be selected. In this case, you can count on the reliability of products whose design has been tested over many years of operation.

If a more modern solution is used - installation, it is worth considering the features of the conditions in which the installation and configuration of Geberit fittings and the system as a whole will take place.

In this case, you can use a device that allows you to control it contactlessly, only approaching or moving away from the sensors.

An important factor when choosing is the price. The cost of conventional Geberit fittings is around $25. As for installations, in this case, of course, the price will be slightly higher - about $200.

In fact, this criterion is deterrent when choosing the right fittings, as well as all plumbing equipment.

Otherwise, installations outperform classical solutions in terms of aesthetics, ergonomics, functionality and durability.

Installation nuances (video)

Mechanism setting

The finished toilet bowl offered in the store always comes with the fittings installed and configured. However, in some cases, you may need to configure it yourself.

This can happen when replacing - installing an entire new node or its individual parts.

There is nothing particularly complicated about this - so it is not necessary to call a plumber to carry out such work (and he will need to pay at least $ 5-10 for such work).

Now - actually, to how exactly this work is performed. Initially, consider how to properly adjust the height of the valve:

  1. The rod is disconnected from the overflow pipe.
  2. The latch holding the "glass" is pressed out.
  3. Rack - Moves up or down as needed.

Now let's figure out in what sequence the water level in the tank is adjusted:

  1. The position of the “glass” changes - it must either be raised or lowered. In this case, there must be at least 45 mm distance from the top of the part to the upper edge of the container.
  2. Overflow pipe - installed above the maximum liquid level, minimum - 20 mm above. However, it must be lower than top part racks - at least 70 mm.

If you want to set up a partial drain (in push-button models), you need to move its float higher or lower (relative to the overflow tube). An example is in the video below.

For the same procedure, only performed for complete draining, you need to move the damper itself (relative to the “glass”) - an example in the video below.