Examples of conclusions on the inspection of internal engineering networks. Inspection of engineering systems. Design of buildings and structures

For directors and other high-ranking representatives of the population of the third planet from the sun


Upon completion, the customer will be issued a certificate and conclusion. As well as confirmation of the work performed.

Utility Survey Cost Calculator
Select building type

Commercial buildings Trade MFC Administrative Industrial Warehouse MFC Residential development

M2:

Survey
Design cost calculation
Price design work by main sections
from 10 999 m2, Vstr=31 892 m3
Settlement and explanatory note0 0
Analysis of as-built documentation, drawing up a list of defects, photo fixation of the object of examination0 0
Power supply system, photographic fixation0 0
Cold water supply system, photographic fixation0 0
DHW water supply system, photographic fixation0 0
Drainage system, photo fixation0 0
Heating ventilation and air conditioning, heating networks, photographic recording0 0
Communication networks, photography0 0
Gas supply, photographic fixation0 0
Concrete strength measurement by ultrasonic method0 0
Carries out the opening of structures, selection of concrete samples, determination of the composition and reinforcement0 0
Development of building plans in PDF format based on BTI0 0
Development of plans for the placement of elements of the internal engineering systems of the building (risers of VC, OV, placement of ASU, placement of engineering communications inputs)0 0
Determination of the geological conditions of the building site (properties of foundation soils)0 0

  1. Sample for design and survey - KP, TK, ESTIMATE technical examination of engineering systems up to 1500 m2
  2. Sample for design and survey - KP, TK, ESTIMATE technical examination of structures up to 1500 m2
Inspection of engineering networks of treatment facilities

Inspection of treatment facilities- begins with the preparation of technical specifications. The chief engineer visits the facilities or CEO appointing specialists responsible for the specific production of works. At the end, a detailed plan will be drawn up, including the results of the research, a list of equipment with recommendations for use and of course the details of the upgrade.

Inspection of water supply systems

Inspection of water supply systems- a set of measures aimed at clarifying the actual and obsolescence of the engineering water supply system. Includes a detailed visual inspection by specialists, control using narrow-profile equipment and design work. Upon completion, a study report is drawn up, which details the results, recommendations, best practices modernization and maintenance.

Survey electrical networks

Inspection of electrical networks- usually initiated by the company on the fact of excess electricity costs or on the onset of an emergency. Networks, electrical installations, input devices are examined directly. Based on the issued conclusion, actions are taken to improve, repair, and dismantle systems.

Inspection of engineering networks of ventilation ducts

Inspection of ventilation ducts- this includes checking the design documentation and working calculations to assess the feasibility of the installation. Control of the system, air channels and nodes. Finally, recommendations are made as needed efficient use, repair or upgrade.

Examination of the ventilation system

Examination of the ventilation system– comes down to measuring parameters (air flow rate, transparency, amount of suspended particles, humidity) and comparing the obtained data with those calculated for a particular system. In case of a significant discrepancy, the system is examined for incorrect operation of nodes and components.

Ventilation inspection report

Ventilation inspection report– includes the data shown by the calculation when designing the system and the practical parameters of the operating system. With a significant discrepancy between the parameters, measures are indicated to equalize them.

Exhaust ventilation in production

Exhaust ventilation in production– extremely necessary for pumping the required amount of clean oxygen-saturated air into the room, removal outside the working area harmful to health human products of production. Most best option of all possible systems ventilation in most types of production.

Validity of engineering surveys- defined by law as 2-3 years. The results with a period of more than 3 years are included in the history of engineering surveys, they are necessary for the conclusion during the re-reconnaissance study.

Obtaining GPZU, SPOZU in Moscow

Obtaining GPZU, SPOZU in Moscow- perhaps in the committee for urban planning and architecture in the city of Moscow, or in the Moscow Committee for Architecture.

First of all, you need to collect a package of confirmed papers. The term of rendering services from the moment of submission of documents to issuance: 30 days.

What is GPZU, SPOZU

What is GPZU, SPOZU- a set of documents properly executed by the responsible person, Scheme of the planning organization of the land plot or in the form of an abbreviation. Describes in detail the special purpose of a particular territory, characteristics and possibilities for construction.

Samostroy

Samostroy- a structure erected without proper permits and approvals. In places not intended for that.

How to legalize unauthorized construction

How to legalize unauthorized construction- you should start by calling a commission from the local authorities of the municipality. Which will issue the necessary confirmations. Directly the decree on the legalization of the building will be obtained in the arbitration court.

Legalization of unauthorized construction

Legalization of unauthorized construction- we apply the latest research and achievements in both technical and legal terms, so that you get the opportunity to solve the problem with minimal effort.

Temporary structure, definition

Temporary structure, definition- Recognized structures and structures that can be moved without causing disproportionate damage. An integral structure, not connected with the land and utilities, which does not have a rigid foundation, which is not possible to release without destroying the structure.

List of documents for putting the object into operation

List of documents for putting the object into operation- this includes: a statement from the developer and investor on the issuance of documents for putting the object into operation, confirmation of acceptance, a document confirming the parameters of the erected object in accordance with the current regulations. Papers confirming the compliance of the erected building with the technically approved project.

Procedure for registering a land plot

Procedure for registering a land plot– statements describing the purpose of acquiring rights to the site, supporting document indicating perpetual use or lifetime ownership and justifying the reason. An extract from the household book, an act on the receipt of land, is issued by the local government. One document confirming the owner of the land. Confirmation of payment of the state duty and a passport of a citizen of the Russian Federation.

The composition of the redevelopment project

The composition of the redevelopment project- includes: a diagram of the device of partitions, reinforcement of openings. Systems of water supply, sewerage and heating.

Plan before work starts. Measures to ensure industrial and fire safety. Project manager confirmation.

The cost of the renovation project

The cost of the renovation project- includes the cost of drawing up a design, draft and working draft.
Author's supervision.
A significant proportion is the preparation of the necessary documents.
Refurbishment project- pursues the goal of ensuring complete structural safety of engineering systems, operational characteristics and structure structures. Project design standards are regulated in accordance with GOST 21.101-97 and GOST 21.501-93.
Development of a redevelopment project- begins with the provision of documents from the Bureau of Technical Inventory and a sketch of redevelopment.

Mezzanine

Mezzanine- in world practice, an additional room built into the main body of the building, in Russian architecture - a shelf in the upper part of the room used to store a home scrub.

Sample act of inspection of the object

Sample act of inspection of the object- filled in by members of the commission that examined the property and makes a conclusion. Fixing the data in the survey report.

The act of inspection of the property- a document confirming the readiness of the property for operation. Compiled for newly erected and renovated buildings. Compiled by an authorized commission of administrative authorities. It has the task of improving the overall picture of construction.
The act of inspection of buildings and structures sample- a document confirming the inspection of the structure by a group of persons. For the next inspection of the building, only competent persons should be involved, who are obliged to assess all identified deficiencies in the building.
Building Inspection Certificate Sample– cannot be used as a supporting document. Applicable for familiarization with the formal rules for filling out reports.
The act of inspection of building structures- confirms the control and examination of the condition of the structures of the building and structures. In the case of a defect that cannot be eliminated without dismantling the structures, a separate act of eliminating the defect is drawn up.

Control of building structures

Control of building structures- It is carried out upon the erection of a building or structure. In the future, scheduled or unscheduled, it takes place in the presence of a competent commission with the registration of results. And entering the data into the current documentation for further analysis.

Expert opinion sample document- used for the initial drawing up of the conclusion. Can be used as a secondary confirmation, not suitable as a final expert opinion.

Examination of buildings and structures

Examination of buildings and structures- aims to determine the residual resource and technical condition of buildings and structures. An assessment of how much the erected building meets the requirements and how much it meets the industrial safety requirement.

Act technical inspection - carried out in order to confirm the technical inspection of the building. In order to safely operate the building, a commission of authorized members is needed to confirm the readiness of the building for operation.
Building inspection report sample– can be downloaded from our website. It is used as a draft version of the document submitted to the competent authorities for greater accuracy and error reduction.
The act of inspection of buildings and structures- captures the state of the object at the present moment. It details the defects. All changes are recorded in writing, after which the document is certified by the parties of the customer and interested third-party organizations. Does not display the overall set of technical condition.
The act of inspection of the construction site- is compiled at the time of a scheduled or unscheduled inspection of the construction site to identify technical details and compliance of technological operations with the terms of reference.
Act of defecation form- is necessary only in cases of finding a significant defect in the structure of the building and structure. The form can be downloaded from the website of the local authority "Rostekhnadzor".
Fault detection act- a document certifying that the building and structure cannot be used for its intended purpose. Has severe defects, needs serious repairs. Compiled by an authorized commission of specialists.
Opening in the bearing wall cost - the price consists of the complexity of the technical implementation. In particular, the material of the wall, brick, monolithic concrete Or a panel house. Based on the material, choose the tool. Depending on the chosen tool and the classification of specialists, the final figure is added up.

Opening reinforcement project

Opening reinforcement project- is developed by design organizations - members of the SRO or the authors of the building project. According to housing legislation, openings in load-bearing walls have a significant impact on safety. Therefore, they must be properly drawn up at the Moszhilinspektsii.

Gain metal beams

Reinforcement of metal beams- It can be local or general. Local reinforcement due to welding of additional stiffeners. General - the creation of the lower belt of sprengels, the removal of the reference voltage.

Concrete expertise

Concrete expertise- reconciliation of the actual quality of the product with the characteristics shown in the project documentation.

The highest quality strength measurement is carried out using concrete cores taken from the finished building.
Determination of concrete strength- it is possible to determine by the method of destructive control, indirect non-destructive and direct non-destructive. Ultrasonic testing. Regardless of the method or equipment, the measurement error is never less than 30%.
Concrete testing laboratory- concrete composition is complex, and therefore, an analysis of each component is necessary for evaluation. The laboratory selects the required composition of concrete, depending on the technical specifications, as well as the composition of gravel, cement, sand. Determination of properties of vibrations and reinforcing bars.

Methods for quality control of welded joints

Methods for quality control of welded joints– Distinguish destructive methods of control. The model of the welded product is subjected to mechanical tests. And unbrakable control: visual, pneumatic and hydraulic tests. Magnetographic and X-ray control.
Ultrasonic control.

Flaw detection laboratory- a set of tools and methods aimed at the production of flaw detection testing by all available methods: destructive and non-destructive testing, ultrasound examinations, visual control, etc.. Engaged in the development of methods for detecting defects and creating practical devices based on their principles.
Checking the quality of welds- there are several types of welds, depending on the purpose, the quality also varies. Accordingly, control methods.
Weld test- carried out after cooling, may vary depending on the purpose of the connection. Distinguish control visual, ultrasonic and x-ray.
Weld control- visual, ultrasonic or x-ray method for examining the result of welding work. To check the quality of the connection.

Design of buildings and structures

Design of buildings and structures– is carried out on the basis of the terms of reference, geological conditions and regulatory acts and laws.

Project documents undergo multiple checks through authorities and regulatory authorities and are approved only after general agreement.
Building project- a graphically and mathematically modeled and documented building model used to create an estimate and more detailed study of operations during the construction of a building.
Construction design - development of the most optimal technological process in accordance with economic models, given technical conditions and its geological capabilities.
Building facade design- settlement and graphic works, as well as a general and sectional plan of the facade of the building, taking into account the specific site and the specifics of its operation and construction.
Building design price- design cost, a complex set of key costs (work of specialists, costs of work, etc.)
Building design cost- the total cost of creating a project with the participation of technical specialists, developing solutions. As well as overhead, legal and other expenses.
Sample projects– we finalize, refine and process standard projects for your tasks, technical solutions and wishes. Sample project usually the basis of all private projects is used to reduce the same type of work.
Project shopping center - compiled taking into account supply chains, human flows, urban communications. Closely integrated with the housing economy and infrastructure facilities.
Project working documentation, working draft - a set of transitions, operations and plans from different angles for the production of specific technical actions(masonry, finishing, facade plan, sectional plan).
What is project documentation- a set of graphic and calculation materials that make up the apotheosis of preliminary work in preparation for the construction of a building and structure.
Design of industrial facilities- similar to other types of design, but taking into account the financial and budget analysis, calculations of product sales. Designing with the implementation of all possible measures for the successful implementation of the project.
Production design- in accordance with the requirements of regulatory and technical acts. Taking into account the use of production equipment and materials. The basis is a project developed specifically for you, taking into account the preferences and recommendations of the customer. No generic solutions.

measurements

measurements- a set of actions aimed at accurately measuring the dimensions of the room (width, height, volume, area). Necessary for repair, cost estimation installation work. When installing communications, cosmetic repairs and other actions.

Measurement of premises- the primary procedure is integral to the examination, repair, redevelopment. Other technical or legal actions in relation to the premises.
Room measurements cost- this includes the cost of remuneration to specialists, overhead costs and depreciation of equipment. Also, the price varies greatly depending on the size.

Suggest other types of cooperation. Well!

1. We conduct a survey of engineering systems in the following scope:

  • Inspection of hot water systems - description DHW systems, inspection of pipelines and circulation pumps, description of hot water preparation technology and used water heaters, instrumental measurements - temperature measurements, determination of the thickness of corrosion deposits. Development of drawings with the application of pipelines and wiring of the hot water supply system on floor plans, indicating the diameters and linking to existing structures.
  • Inspection of heating and heat supply systems - inspection of the heat input and central heating, description of the heating system and wiring diagram of the supply and return lines, inspection heating appliances, carrying out temperature measurements, determining the thickness of the narrowing of the living section of pipelines, applying the heating system to floor plans.
  • Inspection of cold water supply systems - inspection of the water supply to the building, inspection of the metering station cold water and instrumentation, description of the water supply system, determination of the thickness of corrosion deposits in pipelines, drawing the cold water supply system on plans with the designation of diameters.
  • Inspection of sewerage systems - inspection of pipelines and sanitary appliances, inspection of ventilation risers and revisions, determination of the slope of horizontal pipelines, drawing sewer risers and appliances on floor plans.
  • Inspection of ventilation systems - type identification ventilation system, inspection of ventilation ducts and ventilation equipment, determination of air exchange in the examined premises of the building, identification of defects and comparison with regulatory requirements.
  • Inspection of waste disposal systems - examination of waste collection chambers, establishing the integrity and tightness of the shaft, establishing compliance with the requirements of the design and normative documentation.
  • Inspection of gas supply systems - description of the structural diagram of the gas supply system, study of documentation for gas pipelines and equipment, determination of the compliance of the gas pipeline system with design documentation.
  • Examination of the technical condition of drains - a description of the drainage system, reveals unacceptable damage - blockages, tightness of joints, the presence of gratings and caps, the presence of an electric heating cable.
  • Inspection of electrical networks and means of communication - description of the input-distribution device, inspection electrical cabinets on the floors, inspection lighting fixtures, inspection of low-voltage systems, application electrical panels and wiring of power supply to building plans.
  • Survey engineering equipment- the actual state of the used equipment for various purposes is determined. Physical and moral wear and tear is determined in accordance with the identified defects and malfunctions.


2. The composition of the technical report on the inspection of engineering systems and networks

1. Explanatory note - description of the surveyed engineering systems

2. Inspection of heating and heat supply systems of the building

  • description of heating and heat supply systems
  • drawing heating systems on floor plans
  • instrumental examination of heating and heat supply systems, defects, conclusions and recommendations

3. Inspection of building ventilation systems

  • description of ventilation systems
  • drawing ventilation systems on floor plans
  • instrumental examination of ventilation systems, defects, conclusions and recommendations

4. Inspection of water supply and fire extinguishing systems of the building

  • description of water supply and fire extinguishing systems
  • drawing water supply and fire extinguishing systems on floor plans
  • instrumental examination of water supply and fire extinguishing systems, defects, conclusions and recommendations

5. Inspection of the building's drainage systems

  • description of drainage systems
  • drawing drainage systems on floor plans
  • instrumental examination of drainage systems, defects, conclusions and recommendations

6. Inspection of building electrical systems

  • description of power supply systems
  • drawing power supply systems on floor plans
  • instrumental inspection of power supply systems, defects, conclusions and recommendations

7. Results of calculations of existing loads on the building, analysis of input nodes for the possibility of increasing loads, identification of places for possible connections of new networks

8. Conclusions based on the results of the inspection of engineering systems of the building

10. Executive schemes - plans with applied engineering systems