Elimination notice. Notice of elimination of violations during construction, reconstruction of a capital construction facility. A sample of filling out a notice of the start of construction


NOTICE

on elimination of violations during construction, reconstruction of a capital construction object

(place of compilation)


1. Developer or customer or person carrying out construction

(name of builder or customer,

number and date of issue of the certificate of state registration, PSRN, TIN,

postal details, phone / fax - for legal entities and individual entrepreneurs; surname, name, patronymic of the builder,

passport details, place of residence, phone / fax - for individuals)









(mail

or building)







6. Type of violation

(description of the violation, number and date of issue of the order to eliminate the violation

7. Date of elimination of the violation in accordance with the order

8. Actual date of elimination of the violation

9. Applications:

(number of sheets)

(list of documents confirming the elimination of the violation, attached to this notice)

____________/_________________/___________________________________

(for the person carrying out

construction, which is

legal entity)

__________________/_____________________/ ______________________________________________________

(signature) (signature transcript) (position - for the developer or customer,

being a legal entity)

being a legal entity)

Receipt Mark:



NOTICE

on the occurrence of an emergency during the construction, reconstruction of a capital construction facility

______________________________ "____" ________________20___

(place of compilation)


2. Capital construction object

(name of the capital construction object,

brief design characteristics of the capital construction object)

3.Address of the capital construction object

(postal or construction)

4. Permit for the construction of a capital construction object

(number and date of issue, issuer, expiration date)

5. Conclusion of the state examination of project documentation

(number and date of issue, issued by whom)

6. Description of the emergency

__________/______________/___________________________________________

(signature) (signature transcript) (position - for the person carrying out the construction,

being a legal entity)

M.P. (for the person carrying out construction, which is a legal entity)

________________/__________________/ ___________________________________________________________

(signature) (signature transcript) (position - for the developer or customer, which is a legal entity)

M.P. (for the developer or customer, being a legal entity)
Receipt Mark:

(to be filled in by an official of the Republican Service of State Construction Supervision)
"____" __________ ___________ at ________ hours _________ minutes (local time)


Application No. 7

to the Administrative Regulations for the Execution by the Republican Service of State Construction Supervision state function on the implementation of regional state construction supervision during construction, reconstruction of capital construction projects

NOTICE

on the completion of construction, reconstruction

capital construction object

№ _____________


(case number assigned by the Republican Service of State Construction Supervision)

_______________________

"____" ________________ 20___

(place of compilation)

1. Developer or customer


(name of developer or customer, number and date of issue of the certificate

on state registration, PSRN, TIN, postal details, telephone / fax - for legal entities and individual

entrepreneurs; surname, name, patronymic of the builder, passport details, place of residence, telephone / fax - for individuals)

2. Capital construction object

(name of the capital construction object,

brief design characteristics of the capital construction object)

3.Address of the capital construction object

(mail

or building)

4. Permit for the construction of a capital construction object

(number and date of issue, issuer, expiration date)

5. Conclusion of the state examination of project documentation

(number and date of issue, issued by whom)

6. Start of construction, reconstruction

(work start date)

7. Completion of construction, reconstruction

(work completion date)

This notice confirms the actual completion of construction, reconstruction of the capital construction facility, elimination of all violations, compliance of the work performed with the requirements of technical regulations (norms and rules), other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping capital construction facilities with metering devices used energy resources, execution of documentation related to the implementation of all works on construction, reconstruction, overhaul, as well as the use building materials(products).

Appendix :

(design and working documentation according to the inventory, as-built documentation in accordance with the act of acceptance and transfer (register) according to the model given in Appendix No. 26 to the Administrative Regulations for the execution by the Republican Service of State Construction Supervision of the state function for the implementation of state construction supervision during construction, reconstruction, overhaul capital construction facilities and other documentation required for the final inspection)


/ /

Signature

full name

position for the developer (customer), which is a legal entity

M.P .

(for the developer or customer, which is a legal entity)

Receipt Mark:

(to be filled in by an official of the Republican Service of State Construction Supervision)
"____" __________ ___________ G.

Regulatory documents in the field of activity

______________________________

Episode 18

Documents on safety, supervisory
and licensing activities
in the field of construction

Release 2

NORMATIVE LEGAL ACTS
IN THE IMPLEMENTATION OF THE STATE
CONSTRUCTION SUPERVISION

Collection of documents

2nd edition, revised and enlarged

Moscow
CJSC NTC PB
2017

This collection presents the regulatory legal acts of Rostekhnadzor that regulate the execution of production and executive documentation during the construction, reconstruction and overhaul of facilities, as well as the procedure for exercising state construction supervision.

The collection is intended for:

officials of bodies and organizations exercising state construction supervision;

organizations and persons exercising construction control during the construction, reconstruction and overhaul of capital construction facilities;

all organizations and persons engaged in construction activities in Russian Federation.

The documents of the collection are given in the editions valid as of 03/06/2016.

ORDER
conducting inspections during the implementation of state construction
supervision and issuance of conclusions on the conformity of constructed, reconstructed,
requirements
technical regulations (norms and rules), other regulatory legal acts
and project documentation*

RD-11-04-2006

___________

* Bulletin of normative acts of federal executive authorities. 2007. No. 15. As amended by the order of Rostekhnadzor dated July 14, 2015 No. 273, registered by the Ministry of Justice of Russia on November 13, 2015, reg. No. 39707 (Official Internet portal of legal information (www.pravo.gov.ru), November 18, 2015, publ. No. 0001201511180007). ( Note. ed.)

I. GENERAL PROVISIONS

1. This Procedure for conducting inspections when making conclusions on the compliance of constructed, reconstructed, repaired capital construction facilities with the requirements of technical regulations (norms and rules), other regulatory legal acts, project documentation (RD-11-04-2006) (hereinafter referred to as the Procedure) has been developed on the basis of Article 54 of the Town Planning Code of the Russian Federation (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2005, No. 1, Art. 16; No. 30, Art. 3128; 2006, No. 1, Art. 10, Art. 21; No. 23, Art. 2380; No. 31, item 3442; No. 50, item 5279; No. 52, item 5498; 2007, No. 1, item 21; No. 21, item 2455; No. 31, item 4012; No. 45, item 5417 ; No. 46, item 5553; No. 50, item 6237; 2008, No. 20, item 2251, item 2260; No. 29, item 3418; No. 30, item 3604, item 3616; No. 52, item 6236; 2009, No. 1, item 17; No. 29, item 3601; No. 48, item 5711; No. 52, item 6419; 2010, No. 31, item 4195, item 4209; No. 48, item 6246; No. 49, item 6410; 2011, No. 13, item 1688; No. 17, item 2310; No. 27, item 3880; No. 29, item 4281, item 4291; No. 30, item 4563 , item 4572, item . 4590, Art. 4591, Art. 4594, Art. 4605; No. 49, art. 7015, Art. 7042; No. 50, art. 7343; 2012, no. 26, art. 3446; No. 30, Art. 4171; No. 31, Art. 4322; No. 47, art. 6390; No. 53, art. 7614, art. 7619, Art. 7643; 2013, no. 9, art. 873, Art. 874; No. 14, art. 1651; No. 23, art. 2871; No. 27, art. 3477, Art. 3480; No. 30, Art. 4040, 4080; No. 43, art. 5452; No. 52, Art. 6961, art. 6983; 2014, no. 14, art. 1557; No. 16, art. 1837; No. 19, art. 2336; No. 26, art. 3377, art. 3386, Art. 3387; No. 30, art. 4218, Art. 4220, Art. 4225; No. 42, art. 5615; No. 43, art. 5799, art. 5804; No. 48, art. 6640; 2015, no. 1, art. 9, art. 11, art. 38, Art. 52, Art. 72, Art. 86, no. 27, art. 3967) (hereinafter referred to as the Town Planning Code of the Russian Federation) and the Regulations on the implementation of state construction supervision in the Russian Federation, approved by Decree of the Government of the Russian Federation of February 1, 2006 No. 54 (Collected Legislation of the Russian Federation, 2006, No. 7, Art. 774; 2008 , No. 8, item 744; 2009, No. 11, item 1304; 2011, No. 7, item 979; No. 18, item 2645; 2012, No. 7, item 864; 2013, No. 24, item 2999 ; No. 30, article 4119; 2014, No. 19, article 2421) (hereinafter - the Regulations on the implementation of state construction supervision in the Russian Federation *).

___________

2. This Procedure establishes the requirements for the federal executive bodies authorized to exercise federal state construction supervision, other federal executive bodies entrusted with state construction supervision by decrees of the President of the Russian Federation, the State Atomic Energy Corporation "Rosatom" and executive bodies the authorities of the constituent entities of the Russian Federation authorized to carry out regional state construction supervision (hereinafter referred to as the state construction supervision body) of checking the compliance of the work performed during the construction and reconstruction of capital construction facilities with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements of energy efficiency and requirements for equipping buildings, structures, structures with metering devices for energy resources used (hereinafter referred to as verification rki), and registration of the results of such inspections, as well as the requirements for issuing conclusions on the compliance of the constructed, reconstructed capital construction object with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction object with instruments taking into account the energy resources used or making a decision to refuse to issue such an opinion.

2.1. State construction supervision is carried out in cases specified in part 1 of article 54 of the Town Planning Code of the Russian Federation.

2.2. The provisions of the Federal Law of December 26, 2008 No. 294-FZ “On the protection of the rights of legal entities and individual entrepreneurs in the exercise of state control (supervision)” apply to relations related to the implementation of state construction supervision, the organization and conduct of inspections of legal entities, individual entrepreneurs and municipal control” (Sobraniye zakonodatelstva Rossiyskoy Federatsii, 2008, No. 52, item 6249; 2009, No. 18, item 2140; No. 29, item 3601; No. 48, item 5711; No. 52, item 6441; 2010 , No. 17, item 1988; No. 18, item 2142; No. 31, item 4160, item 4193, item 4196; No. 32, item 4298; 2011, No. 1, item 20; No. 17, item 2310; No. 23, item 3263; No. 27, item 3880; No. 30, item 4590; No. 48, item 6728; 2012, No. 19, item 2281; No. 26, item 3446; No. 31, 4320, item 4322; No. 47, item 6402; 2013, No. 9, item 874; No. 27, item 3477; No. 27, item 4041; No. 44, item 5633; No. 48, item 6165; No. 49, item 6338; No. 52, item 6961, item 6979, item 6981; 2014, No. 11, item 1092, item 1098; No. 26, item 3366; No. 30, item 4256 No. 42 , Art. 5615; No. 48, Art. 6659; 2015, no. 1, art. 53, Art. 64, art. 72, Art. 85; No. 14, Art. 2022, no. 27, art. 3950) (hereinafter - the Federal Law of December 26, 2008 No. 294-FZ), taking into account the specifics of the organization and conduct of inspections established by Part 5 of Article 54 of the Town Planning Code of the Russian Federation.

3. Grounds for conducting inspections:

a) receipt from the developer, technical customer of a notice about the start of construction, reconstruction of a capital construction object, sent in accordance with Part 5 of Article 52 of the Town Planning Code of the Russian Federation, about the completion of construction, reconstruction of a capital construction object;

b) an inspection program developed by the state construction supervision body;

c) receipt from the builder, technical customer, person carrying out construction, notification of changes in the deadlines for completion of work subject to inspection, if the deadline for completion of such work does not coincide with the deadlines specified in the inspection program;

d) receipt from the developer, technical customer, person carrying out construction, notification of cases of emergency situations at the capital construction facility;

e) receipt from the developer, the technical customer, the person carrying out the construction, notification of the elimination of violations, as well as the expiration of the deadline for the legal entity, individual entrepreneur to comply with the order issued by the state construction supervision body to eliminate the identified violation of mandatory requirements;

f) the presence of an order (instruction) of the head (deputy head) of the state construction supervision body, issued in accordance with the order of the President of the Russian Federation or the Government of the Russian Federation or on the basis of the prosecutor's request to conduct an unscheduled inspection as part of supervision over the implementation of laws based on materials received by the prosecutor's office and appeals;

g) appeals and statements of citizens, including individual entrepreneurs, legal entities, information from public authorities (officials of the state supervision body), local governments, from the media about the facts of the accident, violations of technical regulations, other regulatory legal acts and project documentation when performing work in the process of construction, reconstruction of a capital construction facility, including violations of the mandatory requirements for the building materials used, if such violations pose a threat of harm to life and health of people, environment, security of the state, property of individuals and legal entities, state or municipal property or caused such harm;

h) appeals and applications of citizens, including individual entrepreneurs, legal entities, information from public authorities (officials of the state supervision body), local governments, from the media about the facts of attracting funds from citizens for shared construction apartment buildings and (or) other real estate objects in violation of the legislation of the Russian Federation on participation in shared construction of apartment buildings and (or) other real estate objects.

II. PREPARATION FOR CONDUCTING INSPECTIONS DURING STATE CONSTRUCTION SUPERVISION

4. The official (officials) responsible (responsible) for the implementation of state construction supervision at a specific capital construction facility is appointed (appointed) by order (instruction) of the head (deputy head) of the state construction supervision body (hereinafter - the official of the state construction supervision body ) (Appendix No. to this Procedure).

State construction supervision is carried out in the form of inspections.

Inspections are carried out by an official of the state construction supervision body authorized on the basis of the relevant order (instruction) of the head (deputy head) of the state construction supervision body, issued in accordance with the requirements of Federal Law No. 294-FZ of December 26, 2008.

d) estimated time spent by an official of the state construction supervision body for each inspection;

e) documents to be submitted during the inspections provided for by the inspection program;

f) officials or employees of the developer, technical customer or the person carrying out the construction, whose presence during the inspections provided for by the inspection program is mandatory.

In exceptional cases related to the need to conduct and investigate, on the basis of reasoned proposals from the official of the state construction supervision body conducting the inspection, the inspection period may be extended in the manner and for the period specified in Part 3 of Article 13 of the Federal Law of December 26, 2008 No. 294-FZ.

15. The act drawn up on the basis of the results of the audit and the order issued on its basis are drawn up in 2 copies. The materials and documents or their copies drawn up or received in the course of the inspection shall be attached to the inspection report. The first copies of the act and the order, as well as copies of these documents, are sent (handed over) to the developer, technical customer (if there is a technical customer), a person carrying out construction on the basis of an agreement with the developer or technical customer. The second copies of the act of inspection and instructions, as well as documents drawn up or received in the course of the inspection, remain in the file of the state building supervision body.

In the absence of the head, other official or authorized representative of the legal entity, individual entrepreneur, his authorized representative, as well as in the event of the person being checked refuses to give a receipt for familiarization or refusal to familiarize himself with the inspection report, the act is sent by registered by mail with a notification of delivery, which is attached to a copy of the inspection report stored in the file of the state construction supervision body.

16. After the elimination of the violations identified by the state construction supervision body, the developer, the technical customer (if there is a technical customer), the person carrying out the construction, who have committed violations and who have been issued instructions, send notices to the state construction supervision body about the elimination of violations during construction, reconstruction of the capital construction object (Appendix No. to this Procedure).

After the expiration of the period for eliminating the identified violations specified in the order, the state building supervision body, in the prescribed manner, conducts an unscheduled inspection to monitor the implementation of the previously issued order.

In accordance with part 6 of Article 52 of the Town Planning Code of the Russian Federation, the person carrying out construction (the developer or technical customer or the person carrying out construction on the basis of a contract) is obliged to ensure the elimination of identified violations and not to proceed with the continuation of work until the identified deficiencies are eliminated.

Notify ______ of the fulfillment of this instruction before _______ 20__

(name, address of the state building supervision authority)

___________________________________________________________________________

Person issuing the order:

A copy of the prescription was received by ____________________________________________

___________________________________________________________________________

(to be filled in by a representative of the developer, technical customer,

___________________________________________________________________________

the person carrying out the construction (depending on who committed the violations))

___________________________________________________________________________

Application No. 8


state construction supervision and issuance
repaired capital construction projects

Federal Service for Ecological,
technological and nuclear supervision

1. Developer, technical customer, person carrying out construction ______

___________________________________________________________________________

(name of the developer, technical customer, person carrying out the construction

___________________________________________________________________________

(depending on who committed the violations)

___________________________________________________________________________

number and date of issue of the certificate of state registration,

___________________________________________________________________________

OGRN, TIN, postal details, telephone / fax - for legal entities;

___________________________________________________________________________

surname, name, patronymic of the developer, technical customer, person,

___________________________________________________________________________

carrying out construction, passport data, place of residence,

___________________________________________________________________________

phone/fax - for individuals)

2. Capital construction object _______________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

3. Address (location) of the capital construction object

___________________________________________________________________________

(postal or construction

___________________________________________________________________________

address of the capital construction object)

___________________________________________________________________________

(number and date

___________________________________________________________________________

issuance, by whom issued, validity period)

5. A positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

7. Type of violation _________________________________________________________

(description of violation,

___________________________________________________________________________

number and date of the order to eliminate the violation)

8. Date of elimination of the violation in accordance with the order ___________________

(the date)

9. Actual date of elimination of the violation ___________________________________

(the date)

10. Applications on ____________ sheets:

___________________________________________________________________________

(list of documents confirming the elimination of the violation,

___________________________________________________________________________

attached to this notice)

Familiarization note:

(filled in by an official of the developer or technical customer when sending a notice by a person carrying out construction on the basis of a contract)

"_____" ______________ 20__

Application No. 9

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

1. Developer, technical customer, person carrying out construction _______

___________________________________________________________________________

(name of the developer, technical customer (if there is a technical customer),

___________________________________________________________________________

person carrying out the construction, number and date of issue of the certificate

___________________________________________________________________________

on state registration, PSRN, TIN, postal details, telephone / fax -

___________________________________________________________________________

for legal entities; surname, name, patronymic of the developer or technical customer,

___________________________________________________________________________

2. Capital construction object _______________________________________

___________________________________________________________________________

(name of the capital construction object

___________________________________________________________________________

in accordance with the design documentation, brief design characteristics,

___________________________________________________________________________

description of the stage of construction, reconstruction, if a permit is issued for the stage

___________________________________________________________________________

construction, reconstruction)

3. Address (location) of the capital construction object _________________

___________________________________________________________________________

(mail

___________________________________________________________________________

or building address of the capital construction object)

4. Permit for the construction of a capital construction object _____________

___________________________________________________________________________

(room

___________________________________________________________________________

5. A positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

6. Positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review _______________

___________________________________________________________________________

(room

___________________________________________________________________________

and date of issue, by whom issued)

7. Start of construction, reconstruction ______________________________________

(work start date)

8. Completion of construction, reconstruction __________________________________

(work completion date)

This notice confirms the actual completion of construction, reconstruction of capital construction facilities, the elimination of all violations of the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, documentation associated with the performance of all construction, reconstruction, as well as the use of building materials (products).

Application No. 10

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

CONCLUSION
on the conformity of the constructed, reconstructed object
capital construction to the requirements of technical regulations,
other regulatory legal acts and project documentation, including
including energy efficiency requirements and
equipment of the capital construction object with metering devices
used energy resources

This CONCLUSION is issued by __________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

postal details, telephone / fax - for legal entities;

___________________________________________________________________________

___________________________________________________________________________

passport data, place of residence, telephone / fax - for individuals)

and confirms that the capital construction object __________________________

___________________________________________________________________________

(Object name

___________________________________________________________________________

capital construction in accordance with project documentation

___________________________________________________________________________

brief design characteristics, stage description

___________________________________________________________________________

construction, reconstruction, if a permit is issued for the stage

___________________________________________________________________________

construction, reconstruction)

located at: ___________________________________________________

___________________________________________________________________________

(postal or building address of the object

___________________________________________________________________________

capital construction)

permission for the construction of a capital construction facility

___________________________________________________________________________

(room

___________________________________________________________________________

and date of issue, issuer, expiration date)

a positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review ____________________________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

start of construction, reconstruction __________________________________________

(work start date)

(work completion date)

COMPLIES with the requirements of ______________________________________________

___________________________________________________________________________

(the name, articles (paragraphs) of the technical

___________________________________________________________________________

regulations, normative legal acts, project documentation)

___________________________________________________________________________

The grounds for issuing this CONCLUSION are:

___________________________________________________________________________

(number, date of act

___________________________________________________________________________

inspections of a completed capital construction facility

___________________________________________________________________________

and in case of carrying out the number, the date of the act of verification of the previously issued order)

A copy of the conclusion received:

(filled in by a representative of the developer or technical customer, indicating the details of the representation document)

Note: the conclusion is signed by officials of the state construction supervision body who took part in the inspection (s) of the completed construction (reconstruction) of the object.

Application No. 11

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

DECISION
on the refusal to issue a conclusion on the conformity of the constructed,
reconstructed capital construction facility
requirements of technical regulations, other regulatory
legal acts and project documentation, including
energy efficiency requirements and
equipment of the capital construction object with instruments
accounting of used energy resources

This DECISION is issued by ______________________________________________

___________________________________________________________________________

(name of developer or technical customer,

___________________________________________________________________________

number and date of issue of the certificate of state registration, PSRN, TIN,

___________________________________________________________________________

postal details, telephone / fax - for legal entities;

___________________________________________________________________________

surname, name, patronymic of the developer or technical customer,

___________________________________________________________________________

passport data, place of residence, telephone / fax - for individuals)

on the refusal to issue a CONCLUSION on the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used by the capital construction facility ___________________________________

___________________________________________________________________________

(name of the capital construction object

___________________________________________________________________________

in accordance with the design documentation, brief design characteristics,

___________________________________________________________________________

description of the stage of construction, reconstruction,

___________________________________________________________________________

if permission is granted for construction phase, reconstruction)

located at: _________________________________________________

___________________________________________________________________________

(postal or

___________________________________________________________________________

construction address of the capital construction object)

___________________________________________________________________________

permission for the construction of a capital construction object

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by, expiration date)

a positive conclusion of the examination of design documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) ____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review ____________________________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

start of construction, reconstruction __________________________________________

(work start date)

completion of construction, reconstruction _______________________________________

(work completion date)

This DECISION was adopted on the basis of the results of the inspection of the completed capital construction object _____________________________

___________________________________________________________________________

(number, date of the act of verification

___________________________________________________________________________

completed construction of a capital construction facility, etc.)

which is established _________________________________________________________

___________________________________________________________________________

(the name, articles (clauses) of the technical regulation,

___________________________________________________________________________

normative legal act and project documentation, the requirements of which are violated and as of the date

___________________________________________________________________________

inspection of a completed capital construction facility have not been eliminated)

A copy of the conclusion received:

(filled in by a representative of the developer or technical customer, indicating the details of the representation document)

Document section: Sample Documents, notice


(SAMPLE)

NOTICE N __________ ON THE ELIMINATION OF VIOLATIONS DURING CONSTRUCTION, RECONSTRUCTION, CAPITAL REPAIRS OF CAPITAL CONSTRUCTION OBJECTS

_________________________________________________ (case number assigned by the state construction supervision authority)

_________________________ "__" ________ 200_ (place of compilation)

1. The developer or customer or the person carrying out the construction __________________________________________________________________ (name, number and date of issue of the certificate of state registration __________________________________________________________________, OGRN, TIN, postal details, telephone / fax - for __________________________________________________________________ legal entities; surname, name, patronymic, passport details, place __________________________________________________________________ of residence, phone/fax - for individuals) __________________________________________________________________ 2. Capital construction object _____________________________ (name of the capital construction object __________________________________________________________________, main characteristics of the capital construction object __________________________________________________________________) 3. Capital construction object address construction ___________________________________ (postal __________________________________________________________________ or construction) 4. Permit for construction, reconstruction, overhaul __________________________________________________________________ (number and date of issue, __________________________________________________________________ issued by whom, validity period) ) 6. Type of violation __________________________________________________________________ (description of the violation, __________________________________________________________________ N and date of order to eliminate the violation) 7. Date of elimination of the violation in accordance with the order _______ (date) 8. Actual date of elimination of the violation _______ (date) 9. Attachments on ____ sheets: __________________________________________________________________ (list of documents confirming the elimination of the violation, __________________________________________________________________ attached to this notice)

_________ ____________ ___________________________________________ (signature) (decoding (position - for the developer or customer, signature) of the person carrying out the construction, which are legal entities) M.P. (for the developer or customer, the person carrying out the construction, which are legal entities)

Receipt note: (to be completed by an official of the state construction supervision authority)

_______________ _____________________ ______________________ (signature) (signature transcript) (position)

Save this page.

Regulatory documents in the field of activity

______________________________

Episode 18

Documents on safety, supervisory
and licensing activities
in the field of construction

Release 2

NORMATIVE LEGAL ACTS
IN THE IMPLEMENTATION OF THE STATE
CONSTRUCTION SUPERVISION

Collection of documents

2nd edition, revised and enlarged

Moscow
CJSC NTC PB
2017

This collection presents the regulatory legal acts of Rostekhnadzor that regulate the execution of production and executive documentation during the construction, reconstruction and overhaul of facilities, as well as the procedure for exercising state construction supervision.

The collection is intended for:

officials of bodies and organizations exercising state construction supervision;

organizations and persons exercising construction control during the construction, reconstruction and overhaul of capital construction facilities;

all organizations and persons engaged in construction activities in the Russian Federation.

The documents of the collection are given in the editions valid as of 03/06/2016.

ORDER
conducting inspections during the implementation of state construction
supervision and issuance of conclusions on the conformity of constructed, reconstructed,
requirements
technical regulations (norms and rules), other regulatory legal acts
and project documentation*

RD-11-04-2006

___________

* Bulletin of normative acts of federal executive authorities. 2007. No. 15. As amended by the order of Rostekhnadzor dated July 14, 2015 No. 273, registered by the Ministry of Justice of Russia on November 13, 2015, reg. No. 39707 (Official Internet portal of legal information (www.pravo.gov.ru), November 18, 2015, publ. No. 0001201511180007). ( Note. ed.)

I. GENERAL PROVISIONS

1. This Procedure for conducting inspections when making conclusions on the compliance of constructed, reconstructed, repaired capital construction facilities with the requirements of technical regulations (norms and rules), other regulatory legal acts, project documentation (RD-11-04-2006) (hereinafter referred to as the Procedure) has been developed on the basis of Article 54 of the Town Planning Code of the Russian Federation (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2005, No. 1, Art. 16; No. 30, Art. 3128; 2006, No. 1, Art. 10, Art. 21; No. 23, Art. 2380; No. 31, item 3442; No. 50, item 5279; No. 52, item 5498; 2007, No. 1, item 21; No. 21, item 2455; No. 31, item 4012; No. 45, item 5417 ; No. 46, item 5553; No. 50, item 6237; 2008, No. 20, item 2251, item 2260; No. 29, item 3418; No. 30, item 3604, item 3616; No. 52, item 6236; 2009, No. 1, item 17; No. 29, item 3601; No. 48, item 5711; No. 52, item 6419; 2010, No. 31, item 4195, item 4209; No. 48, item 6246; No. 49, item 6410; 2011, No. 13, item 1688; No. 17, item 2310; No. 27, item 3880; No. 29, item 4281, item 4291; No. 30, item 4563 , item 4572, item . 4590, Art. 4591, Art. 4594, Art. 4605; No. 49, art. 7015, Art. 7042; No. 50, art. 7343; 2012, no. 26, art. 3446; No. 30, Art. 4171; No. 31, Art. 4322; No. 47, art. 6390; No. 53, art. 7614, art. 7619, Art. 7643; 2013, no. 9, art. 873, Art. 874; No. 14, art. 1651; No. 23, art. 2871; No. 27, art. 3477, Art. 3480; No. 30, Art. 4040, 4080; No. 43, art. 5452; No. 52, Art. 6961, art. 6983; 2014, no. 14, art. 1557; No. 16, art. 1837; No. 19, art. 2336; No. 26, art. 3377, art. 3386, Art. 3387; No. 30, art. 4218, Art. 4220, Art. 4225; No. 42, art. 5615; No. 43, art. 5799, art. 5804; No. 48, art. 6640; 2015, no. 1, art. 9, art. 11, art. 38, Art. 52, Art. 72, Art. 86, no. 27, art. 3967) (hereinafter referred to as the Town Planning Code of the Russian Federation) and the Regulations on the implementation of state construction supervision in the Russian Federation, approved by Decree of the Government of the Russian Federation of February 1, 2006 No. 54 (Collected Legislation of the Russian Federation, 2006, No. 7, Art. 774; 2008 , No. 8, item 744; 2009, No. 11, item 1304; 2011, No. 7, item 979; No. 18, item 2645; 2012, No. 7, item 864; 2013, No. 24, item 2999 ; No. 30, article 4119; 2014, No. 19, article 2421) (hereinafter - the Regulations on the implementation of state construction supervision in the Russian Federation *).

___________

2. This Procedure establishes the requirements for the federal executive bodies authorized to exercise federal state construction supervision, other federal executive bodies entrusted with state construction supervision by decrees of the President of the Russian Federation, the State Atomic Energy Corporation "Rosatom" and executive bodies the authorities of the constituent entities of the Russian Federation authorized to carry out regional state construction supervision (hereinafter referred to as the state construction supervision body) of checking the compliance of the work performed during the construction and reconstruction of capital construction facilities with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements of energy efficiency and requirements for equipping buildings, structures, structures with metering devices for energy resources used (hereinafter referred to as verification rki), and registration of the results of such inspections, as well as the requirements for issuing conclusions on the compliance of the constructed, reconstructed capital construction object with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction object with instruments taking into account the energy resources used or making a decision to refuse to issue such an opinion.

2.1. State construction supervision is carried out in cases specified in part 1 of article 54 of the Town Planning Code of the Russian Federation.

2.2. The provisions of the Federal Law of December 26, 2008 No. 294-FZ “On the protection of the rights of legal entities and individual entrepreneurs in the exercise of state control (supervision)” apply to relations related to the implementation of state construction supervision, the organization and conduct of inspections of legal entities, individual entrepreneurs and municipal control” (Sobraniye zakonodatelstva Rossiyskoy Federatsii, 2008, No. 52, item 6249; 2009, No. 18, item 2140; No. 29, item 3601; No. 48, item 5711; No. 52, item 6441; 2010 , No. 17, item 1988; No. 18, item 2142; No. 31, item 4160, item 4193, item 4196; No. 32, item 4298; 2011, No. 1, item 20; No. 17, item 2310; No. 23, item 3263; No. 27, item 3880; No. 30, item 4590; No. 48, item 6728; 2012, No. 19, item 2281; No. 26, item 3446; No. 31, 4320, item 4322; No. 47, item 6402; 2013, No. 9, item 874; No. 27, item 3477; No. 27, item 4041; No. 44, item 5633; No. 48, item 6165; No. 49, item 6338; No. 52, item 6961, item 6979, item 6981; 2014, No. 11, item 1092, item 1098; No. 26, item 3366; No. 30, item 4256 No. 42 , Art. 5615; No. 48, Art. 6659; 2015, no. 1, art. 53, Art. 64, art. 72, Art. 85; No. 14, Art. 2022, no. 27, art. 3950) (hereinafter - the Federal Law of December 26, 2008 No. 294-FZ), taking into account the specifics of the organization and conduct of inspections established by Part 5 of Article 54 of the Town Planning Code of the Russian Federation.

3. Grounds for conducting inspections:

a) receipt from the developer, technical customer of a notice about the start of construction, reconstruction of a capital construction object, sent in accordance with Part 5 of Article 52 of the Town Planning Code of the Russian Federation, about the completion of construction, reconstruction of a capital construction object;

b) an inspection program developed by the state construction supervision body;

c) receipt from the builder, technical customer, person carrying out construction, notification of changes in the deadlines for completion of work subject to inspection, if the deadline for completion of such work does not coincide with the deadlines specified in the inspection program;

d) receipt from the developer, technical customer, person carrying out construction, notification of cases of emergency situations at the capital construction facility;

e) receipt from the developer, the technical customer, the person carrying out the construction, notification of the elimination of violations, as well as the expiration of the deadline for the legal entity, individual entrepreneur to comply with the order issued by the state construction supervision body to eliminate the identified violation of mandatory requirements;

f) the presence of an order (instruction) of the head (deputy head) of the state construction supervision body, issued in accordance with the order of the President of the Russian Federation or the Government of the Russian Federation or on the basis of the prosecutor's request to conduct an unscheduled inspection as part of supervision over the implementation of laws based on materials received by the prosecutor's office and appeals;

g) appeals and statements of citizens, including individual entrepreneurs, legal entities, information from public authorities (officials of the state supervision body), local governments, from the media about the facts of the accident, violations of technical regulations, other regulatory legal acts and project documentation when performing work in the process of construction, reconstruction of a capital construction facility, including violations of mandatory requirements for the building materials used, if such violations pose a threat of harm to life, human health, the environment, state security, property of individuals and legal entities, state or municipal property or caused such damage;

h) appeals and applications of citizens, including individual entrepreneurs, legal entities, information from public authorities (officials of the state supervision body), local governments, from the media about the facts of attracting funds from citizens for the shared construction of apartment buildings and ( or) other real estate objects in violation of the legislation of the Russian Federation on participation in shared construction of apartment buildings and (or) other real estate objects.

II. PREPARATION FOR CONDUCTING INSPECTIONS DURING STATE CONSTRUCTION SUPERVISION

4. The official (officials) responsible (responsible) for the implementation of state construction supervision at a specific capital construction facility is appointed (appointed) by order (instruction) of the head (deputy head) of the state construction supervision body (hereinafter - the official of the state construction supervision body ) (Appendix No. to this Procedure).

State construction supervision is carried out in the form of inspections.

Inspections are carried out by an official of the state construction supervision body authorized on the basis of the relevant order (instruction) of the head (deputy head) of the state construction supervision body, issued in accordance with the requirements of Federal Law No. 294-FZ of December 26, 2008.

d) estimated time spent by an official of the state construction supervision body for each inspection;

e) documents to be submitted during the inspections provided for by the inspection program;

f) officials or employees of the developer, technical customer or the person carrying out the construction, whose presence during the inspections provided for by the inspection program is mandatory.

In exceptional cases related to the need to conduct and investigate, on the basis of reasoned proposals from the official of the state construction supervision body conducting the inspection, the inspection period may be extended in the manner and for the period specified in Part 3 of Article 13 of the Federal Law of December 26, 2008 No. 294-FZ.

15. The act drawn up on the basis of the results of the audit and the order issued on its basis are drawn up in 2 copies. The materials and documents or their copies drawn up or received in the course of the inspection shall be attached to the inspection report. The first copies of the act and the order, as well as copies of these documents, are sent (handed over) to the developer, technical customer (if there is a technical customer), a person carrying out construction on the basis of an agreement with the developer or technical customer. The second copies of the act of inspection and instructions, as well as documents drawn up or received in the course of the inspection, remain in the file of the state building supervision body.

In the absence of the head, other official or authorized representative of the legal entity, individual entrepreneur, his authorized representative, as well as in case of refusal of the person being checked to give a receipt for familiarization or refusal to familiarize with the inspection report, the act is sent by registered mail with a return receipt, which is attached to a copy of the inspection report kept in the file of the state building supervision body.

16. After the elimination of the violations identified by the state construction supervision body, the developer, the technical customer (if there is a technical customer), the person carrying out the construction, who have committed violations and who have been issued instructions, send notices to the state construction supervision body about the elimination of violations during construction, reconstruction of the capital construction object (Appendix No. to this Procedure).

After the expiration of the period for eliminating the identified violations specified in the order, the state building supervision body, in the prescribed manner, conducts an unscheduled inspection to monitor the implementation of the previously issued order.

In accordance with part 6 of Article 52 of the Town Planning Code of the Russian Federation, the person carrying out construction (the developer or technical customer or the person carrying out construction on the basis of a contract) is obliged to ensure the elimination of identified violations and not to proceed with the continuation of work until the identified deficiencies are eliminated.

Notify ______ of the fulfillment of this instruction before _______ 20__

(name, address of the state building supervision authority)

___________________________________________________________________________

Person issuing the order:

A copy of the prescription was received by ____________________________________________

___________________________________________________________________________

(to be filled in by a representative of the developer, technical customer,

___________________________________________________________________________

the person carrying out the construction (depending on who committed the violations))

___________________________________________________________________________

Application No. 8


state construction supervision and issuance
repaired capital construction projects

Federal Service for Ecological,
technological and nuclear supervision

1. Developer, technical customer, person carrying out construction ______

___________________________________________________________________________

(name of the developer, technical customer, person carrying out the construction

___________________________________________________________________________

(depending on who committed the violations)

___________________________________________________________________________

number and date of issue of the certificate of state registration,

___________________________________________________________________________

OGRN, TIN, postal details, telephone / fax - for legal entities;

___________________________________________________________________________

surname, name, patronymic of the developer, technical customer, person,

___________________________________________________________________________

carrying out construction, passport data, place of residence,

___________________________________________________________________________

phone/fax - for individuals)

2. Capital construction object _______________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

3. Address (location) of the capital construction object

___________________________________________________________________________

(postal or construction

___________________________________________________________________________

address of the capital construction object)

___________________________________________________________________________

(number and date

___________________________________________________________________________

issuance, by whom issued, validity period)

5. A positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

7. Type of violation _________________________________________________________

(description of violation,

___________________________________________________________________________

number and date of the order to eliminate the violation)

8. Date of elimination of the violation in accordance with the order ___________________

(the date)

9. Actual date of elimination of the violation ___________________________________

(the date)

10. Applications on ____________ sheets:

___________________________________________________________________________

(list of documents confirming the elimination of the violation,

___________________________________________________________________________

attached to this notice)

Familiarization note:

(filled in by an official of the developer or technical customer when sending a notice by a person carrying out construction on the basis of a contract)

"_____" ______________ 20__

Application No. 9

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

1. Developer, technical customer, person carrying out construction _______

___________________________________________________________________________

(name of the developer, technical customer (if there is a technical customer),

___________________________________________________________________________

person carrying out the construction, number and date of issue of the certificate

___________________________________________________________________________

on state registration, PSRN, TIN, postal details, telephone / fax -

___________________________________________________________________________

for legal entities; surname, name, patronymic of the developer or technical customer,

___________________________________________________________________________

2. Capital construction object _______________________________________

___________________________________________________________________________

(name of the capital construction object

___________________________________________________________________________

in accordance with the design documentation, brief design characteristics,

___________________________________________________________________________

description of the stage of construction, reconstruction, if a permit is issued for the stage

___________________________________________________________________________

construction, reconstruction)

3. Address (location) of the capital construction object _________________

___________________________________________________________________________

(mail

___________________________________________________________________________

or building address of the capital construction object)

4. Permit for the construction of a capital construction object _____________

___________________________________________________________________________

(room

___________________________________________________________________________

5. A positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

6. Positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review _______________

___________________________________________________________________________

(room

___________________________________________________________________________

and date of issue, by whom issued)

7. Start of construction, reconstruction ______________________________________

(work start date)

8. Completion of construction, reconstruction __________________________________

(work completion date)

This notice confirms the actual completion of construction, reconstruction of capital construction facilities, the elimination of all violations of the compliance of the work performed with the requirements of technical regulations, other regulatory legal acts and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for used energy resources, documentation associated with the performance of all construction, reconstruction, as well as the use of building materials (products).

Application No. 10

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

CONCLUSION
on the conformity of the constructed, reconstructed object
capital construction to the requirements of technical regulations,
other regulatory legal acts and project documentation, including
including energy efficiency requirements and
equipment of the capital construction object with metering devices
used energy resources

This CONCLUSION is issued by __________________________________________

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

postal details, telephone / fax - for legal entities;

___________________________________________________________________________

___________________________________________________________________________

passport data, place of residence, telephone / fax - for individuals)

and confirms that the capital construction object __________________________

___________________________________________________________________________

(Object name

___________________________________________________________________________

capital construction in accordance with project documentation

___________________________________________________________________________

brief design characteristics, stage description

___________________________________________________________________________

construction, reconstruction, if a permit is issued for the stage

___________________________________________________________________________

construction, reconstruction)

located at: ___________________________________________________

___________________________________________________________________________

(postal or building address of the object

___________________________________________________________________________

capital construction)

permission for the construction of a capital construction facility

___________________________________________________________________________

(room

___________________________________________________________________________

and date of issue, issuer, expiration date)

a positive conclusion of the examination of project documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) _____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review ____________________________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

start of construction, reconstruction __________________________________________

(work start date)

(work completion date)

COMPLIES with the requirements of ______________________________________________

___________________________________________________________________________

(the name, articles (paragraphs) of the technical

___________________________________________________________________________

regulations, normative legal acts, project documentation)

___________________________________________________________________________

The grounds for issuing this CONCLUSION are:

___________________________________________________________________________

(number, date of act

___________________________________________________________________________

inspections of a completed capital construction facility

___________________________________________________________________________

and in case of carrying out the number, the date of the act of verification of the previously issued order)

A copy of the conclusion received:

(filled in by a representative of the developer or technical customer, indicating the details of the representation document)

Note: the conclusion is signed by officials of the state construction supervision body who took part in the inspection (s) of the completed construction (reconstruction) of the object.

Application No. 11

to the Procedure for conducting inspections during the implementation
state construction supervision and issuance
conclusions on the conformity of constructed, reconstructed,
repaired capital construction projects
requirements of technical regulations (norms and rules),
other regulatory legal acts and design
documentation (RD-11-04-2006), approved by order
Federal Service for Ecological,
technological and nuclear supervision
dated December 26, 2006 No. 1129

DECISION
on the refusal to issue a conclusion on the conformity of the constructed,
reconstructed capital construction facility
requirements of technical regulations, other regulatory
legal acts and project documentation, including
energy efficiency requirements and
equipment of the capital construction object with instruments
accounting of used energy resources

This DECISION is issued by ______________________________________________

___________________________________________________________________________

(name of developer or technical customer,

___________________________________________________________________________

number and date of issue of the certificate of state registration, PSRN, TIN,

___________________________________________________________________________

postal details, telephone / fax - for legal entities;

___________________________________________________________________________

surname, name, patronymic of the developer or technical customer,

___________________________________________________________________________

passport data, place of residence, telephone / fax - for individuals)

on the refusal to issue a CONCLUSION on the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used by the capital construction facility ___________________________________

___________________________________________________________________________

(name of the capital construction object

___________________________________________________________________________

in accordance with the design documentation, brief design characteristics,

___________________________________________________________________________

description of the stage of construction, reconstruction,

___________________________________________________________________________

if the permit is issued for the stage of construction, reconstruction)

located at: _________________________________________________

___________________________________________________________________________

(postal or

___________________________________________________________________________

construction address of the capital construction object)

___________________________________________________________________________

permission for the construction of a capital construction object

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by, expiration date)

a positive conclusion of the examination of design documentation, if the design documentation of the capital construction object is subject to examination in accordance with the requirements of Article 49 of the Town Planning Code of the Russian Federation (indication of the use of standard design documentation or its modification included in the register of standard design documentation) ____________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

positive conclusion of the state environmental review of project documentation, if the project documentation of the capital construction object is subject to state environmental review ____________________________

___________________________________________________________________________

(number and date of issue,

___________________________________________________________________________

issued by whom)

start of construction, reconstruction __________________________________________

(work start date)

completion of construction, reconstruction _______________________________________

(work completion date)

This DECISION was adopted on the basis of the results of the inspection of the completed capital construction object _____________________________

___________________________________________________________________________

(number, date of the act of verification

___________________________________________________________________________

completed construction of a capital construction facility, etc.)

which is established _________________________________________________________

___________________________________________________________________________

(the name, articles (clauses) of the technical regulation,

___________________________________________________________________________

normative legal act and project documentation, the requirements of which are violated and as of the date

___________________________________________________________________________

inspection of a completed capital construction facility have not been eliminated)

A copy of the conclusion received:

(filled in by a representative of the developer or technical customer, indicating the details of the representation document)